Built for Class A/B office building owners
Office park lots demand a different kind of work than retail or industrial — visible finishes, professional crews, tight schedules around tenant operating hours, and the kind of quiet coordination that doesn’t generate complaints. We’ve worked Class A office parks across Chicagoland’s I-88, I-90, and I-294 corridors for decades.
What Class A/B office building owners Need from a Paving Contractor
Class A Standards
Class A office tenants pay top rents and notice everything — clean job sites, polite crews, fresh asphalt that doesn’t track into the lobby, and crisp striping that matches the rest of the asset. We deliver to that standard or we don’t bid the job.
Tight Tenant Schedules
Office tenants operate 6 AM to 8 PM. We schedule work for evenings, weekends, and tenant-light periods (week of July 4, week between Christmas and New Year) to minimize disruption.
Visitor and Reserved Stall Layout
Visitor parking, reserved executive stalls, and clearly-marked emergency-vehicle access are all required at office parks. We re-stripe to current layouts and update reserved-stall numbering as tenants change.
Common Office Park Pavement Issues
Surface oxidation that makes the asphalt look chalky and gray, faded striping near visitor parking, snow-plow damage at curbs and corner returns, drainage failures at low-point catch basins, ADA stall counts that haven’t been updated as tenant counts grew.
Our Office Park Paving Services
Our office-park services include parking lot resurfacing, sealcoating, professional re-striping with reserved-stall numbering, ADA compliance, concrete curb and sidewalk repair, dumpster pad reconstruction, and full-depth reconstruction. We work with REITs, asset management firms, and corporate facility directors across the I-88, I-90, I-294, and I-355 office corridors.
Frequently Asked Questions
Can you work after hours so tenants don’t see disruption?
Do you provide certificates of insurance to tenants who request them?
Can you match the existing pavement so the new section blends in?
Get a Free Office Park Paving Estimate
Every estimate is free, on-site, and itemized. Most on-site estimate within 48 hours, and on-site estimate within 48 hours. Whether you manage one property or 200, we will customize the program to fit your portfolio.
Frequently Asked Questions
Can you work after hours so tenants don't see disruption?
Yes — most office park projects are phased for evenings, weekends, and tenant-light periods. Full sealcoating typically runs Saturday after 6 PM through Sunday by 6 AM.
Do you provide certificates of insurance to tenants who request them?
Yes — COIs are available before mobilization and we routinely send them to corporate tenant risk managers when requested.
Can you match the existing pavement so the new section blends in?
Yes — we mill, tack, and overlay so the new section ties cleanly to existing without visible joints. Crisp striping pulls everything together visually.